Van Dyke improvement project underway in Warren, Centerline

Van Dyke improvement project underway in Warren, Centerline

Posted: Updated:
A massive construction project is underway in Macomb County.

If you travel on Van Dyke, you know how rough it is. Now, jackhammers are out there tearing up a two-and-a-half mile stretch from 11 Mile to Chicago Rd.

The road will be milled, then resurfaced with asphalt. New curbs will be installed. Nine intersections get new traffic signals.

Sidewalks will be ramped to comply with the Americans with Disabilities Act.

Weather permitting, the project will be finished this summer.

That stretch of Van Dyke sees more than 27,000 vehicles per day.
  • Local NewsLocal NewsMore>>

  • VP Joe Biden speaks in Detroit on Labor Day

    VP Joe Biden speaks in Detroit on Labor Day

    Monday, September 1 2014 1:18 PM EDT2014-09-01 17:18:46 GMT
    This is the second time vice president Joe Biden has been in Detroit on Labor Day in the past three years.
    This is the second time vice president Joe Biden has been in Detroit on Labor Day in the past three years.
  • RECALL: Kraft American Singles Cheese Slices

    RECALL: Kraft American Singles Cheese Slices

    Monday, September 1 2014 8:05 AM EDT2014-09-01 12:05:15 GMT
    Kraft voluntarily recalled 7,691 cases of its American Singles cheese product Friday because an ingredient was stored improperly by a supplier.
    Kraft voluntarily recalled 7,691 cases of its American Singles cheese product Friday because an ingredient was stored improperly by a supplier.
  • Minimum wage hike launches this Labor Day

    Minimum wage hike launches this Labor Day

    Monday, September 1 2014 7:30 AM EDT2014-09-01 11:30:54 GMT
    Minimum wage workers across metro Detroit and the rest of the state are getting a small raise this Labor Day.
    Minimum wage workers across metro Detroit and the rest of the state are getting a small raise this Labor Day.
  • Download the FOX 2 Apps


  • FOX 2 News Five-Day Forecast
Powered by WorldNow
Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | New Terms of Service What's new | Ad Choices